The Dul Hasti Power Station is built on the Chenab river. It is a run-of-the-river hydroelectric project in the Kishtwar district of Jammu and Kashmir, with a capacity of 390 MW. It is not on the Beas, Ravi or Sutlej.
Previous Year Questions
Prelims questions are objective MCQs; Mains questions are descriptive and test answer writing. Choose a stage, then filter by subject, topic and year.
Source: questions are reproduced from UPSC Civil Services papers for study and commentary. Answers and explanations are written by upscnest and are not official UPSC keys — see the disclaimer.
The Tapovan and Vishnugarh hydroelectric projects are located in Uttarakhand. Both are run-of-the-river projects on the Dhauliganga river in Chamoli district, and they were damaged in the 2013 disaster. They are not in Madhya Pradesh, Uttar Pradesh or Rajasthan.
The Tehri Hydropower Complex is located on the Bhagirathi river. The Tehri dam, one of the highest in India, is built on the Bhagirathi in Uttarakhand and generates power along with irrigation and water supply. It is not on the Alaknanda, Dhauliganga or Mandakini.
The Omkareshwar Project is associated with the Narmada river. It is a large hydroelectric project in Madhya Pradesh built across the Narmada near the Omkareshwar temple, with a canal network for irrigation. It is not on the Chambal, Tapi or Bhima.
List-I | List-II
A. BALCO | 1. Hirakud
B. HINDALCO | 2. Korba
C. Indian Aluminium Company | 3. Koraput
D. NALCO | 4. Renukoot
BALCO's aluminium plant is at Korba, HINDALCO's at Renukoot, the Indian Aluminium Company's at Hirakud and NALCO's at Koraput, giving the sequence 2-4-1-3. The other codes misplace at least one company, for example by putting NALCO at Korba or BALCO at Koraput.
Uttar Pradesh and Madhya Pradesh signed a memorandum for the Ken-Betwa link, which transfers surplus water from the Ken in Madhya Pradesh to the Betwa basin in Uttar Pradesh as part of the national perspective plan for river linking. The Chambal, Son and Narmada are not the pair involved in this project.
List I | List II
A. Tarapur | 1. Andhra Pradesh
B. Manuguru | 2. Gujarat
C. Kakrapar | 3. Maharashtra
D. Kaiga | 4. Rajasthan
5. Karnataka
Tarapur is in Maharashtra, Manuguru is a heavy water plant in Khammam district, then Andhra Pradesh and now Telangana, Kakrapar is in Gujarat and Kaiga in Karnataka. The order A to D is 3, 1, 2, 5.
Rourkela Steel Plant, the first public-sector integrated plant, was built with West German collaboration, not Soviet; Bhilai had Soviet help and Durgapur British. The other statements are correct: Salem makes stainless steel, Maharashtra Electrosmelt is a SAIL subsidiary, and Visakhapatnam belongs to RINL.
The other three pairs are correct: Essar Power at Jamnagar, the Nabinagar plant in Bihar linked to Indian Railways, and NTPC's Kayamkulam plant in Kerala. SAIL's integrated plants are at Bhilai, Rourkela, Durgapur, Bokaro and Burnpur, so an integrated steel plant at Jaipur in Orissa is not a SAIL unit.
Satara district in Maharashtra is known for wind energy, with the Chalkewadi and adjoining wind farms on the crest of the Western Ghats among India's earliest large wind installations. It has no major thermal, nuclear or large hydro station of that name.